Most business owners deal with perpetual issues and repeated fire drills can seem like an unending nightmare. The inability to get to the root cause of these problems not only eats away at productivity but can also cause project delays, budget overruns, and strained relationships among stakeholders.
The recurrence of the same issues despite continuous efforts to resolve them. When you're on the frontline of construction management, it can be challenging to step back and assess the root causes of persistent problems. This is where the 5 Whys method comes into play.
The 5 Whys technique is remarkably straightforward yet profoundly impactful. Originating from the Toyota Production System, this method encourages you to ask "Why?" five times in succession to drill deeper into the problem and uncover its root cause. Jerry elaborates that while the concept is simple, its application can resolve chronic issues, eliminating the need for constant firefighting and allowing project teams to focus on delivering quality work on time.
One of the most common issues in construction projects is the delayed arrival of materials. Jerry applies the 5 Whys method to this problem:
1. Why are materials arriving late?
- The supplier is not delivering on time.
2. Why is the supplier not delivering on time?
- The supplier is short on stock.
3. Why is the supplier short on stock?
- The supplier didn't anticipate the demand for materials.
4. Why didn't the supplier anticipate the demand?
- They weren't informed of changes in the project timeline.
5. Why weren't they informed of the changes?
- There's poor communication between the project team and the supplier.
By the fifth "Why," it becomes clear that the root cause is poor communication. With this insight, teams can focus on enhancing communication channels to prevent future delays, rather than merely troubleshooting the symptoms.
Note: Go beyond the "5" Whys if need be.
1. Identify the problem: Start with a specific issue that frequently disrupts your project.
2. Ask "Why?" five times: For each answer, probe further by asking why that issue occurred.
3. Analyze the root cause: By the fifth why, you should uncover the root cause of the problem.
4. Implement solutions: Develop strategies to tackle the root cause rather than the symptoms.
5. Monitor outcomes: Continuously monitor the impact of your solutions to ensure the problem is resolved.
Jerry also emphasizes the importance of Look-Ahead Schedules as a complementary tool to the 5 Whys method. By routinely preparing two-week or four-week look-ahead schedules, project managers can anticipate potential issues and address them proactively. This practice not only improves communication but also ensures that all necessary resources and materials are in place ahead of time, thereby reducing the likelihood of "oh, crap" moments.
In Jerry's experience, the discipline of creating look-ahead schedules revealed countless overlooked issues and facilitated smoother operations. A well-prepared look-ahead schedule can trigger necessary checks and phone calls, ensuring that everyone is on the same page and that no critical elements are missed.
While the 5 Whys method is an excellent starting point, Jerry urges his listeners to delve deeper into lean construction principles. This methodology, which has its roots in post-World War II manufacturing processes, offers a myriad of tools and practices designed to optimize efficiency, reduce waste, and improve overall project outcomes.
Lean construction focuses on enhancing value for the client by optimizing the workflow of construction activities. By removing unnecessary steps and promoting a culture of continuous improvement, lean principles drive innovation and boost project performance. Jerry points out that many leading contractors are now adopting lean construction practices and seeing significant improvements in their project delivery.
In the incessant hustle and bustle of construction projects, the 5 Whys method emerges as a beacon of clarity and resolution. Jerry Aliberti's insights underscore the potential of this lean construction tool to transform how project managers and teams approach recurring issues. By delving into the root causes of problems and implementing proactive measures like look-ahead schedules, construction professionals can shift from fire-fighting mode to a state of heightened preparedness and efficiency.
If you're continually grappling with the same problems and seeking sustainable solutions, it's time to integrate the 5 Whys into your toolkit. Start by identifying a persistent issue, ask "why" five times, and take action to address the root cause. Pair this with diligent look-ahead scheduling, and you'll be well on your way to streamlined operations and successful project outcomes. For those hungry for more, diving into the broader spectrum of lean construction principles can unlock new realms of efficiency, fostering a culture of continuous improvement and excellence.
Remember, construction is not just about bricks and mortar; it's about building a foundation for success, one why at a time.
To learn how Pro-Accel can help you implement many more problem-solving tools in your company, contact Jerry Aliberti at jerry@pro-accel.com to set up a Free consultation.
Do you have a question about our construction consulting service? Email us to schedule a call for a free consultation to find out more about how we can optimize your construction company!
All Rights Reserved | Pro Accel | Website Built by GW Branding Group